S-2.1, r. 14 - Regulation respecting occupational health and safety in mines

Full text
256. Except during the operation to align a hoist with the floor of a shaft station:
(1)  the devices installed in the shaft stations for starting up a hoist shall be designed so that they can be operated only when the gate of the shaft is closed at the level where the conveyance is stopped;
(2)  there shall be a minimal delay of 5 seconds between the operation of any shaft station device to initiate hoist motion and the actual motion.
O.C. 213-93, s. 256.